(E : Engineering / P : Procurement / M : Manufacture / C : Construction)
Clients / Projects | NH Chemical / N-PJT - Civil and SMP (Steel Structure, Mechanical and Plumbing; including insulation and painting) works (including tank manufacturing) |
---|---|
Project Details | E / M / C |
Contract Period | 2021.04 ~ 2022. 06 |
Work Scope | Design / Construction - Civil engineering, architecture, steel structure, machinery, piping, insulation, painting |
Clients / Projects | E&D / CP Expansion PJT - Civil engineering, steel frame, machinery, electrical equipment, insulation, painting work (including manufacturing 18 types of 24 units of equipment) |
---|---|
Project Details | E / P / M / C |
Contract Period | 2021. 12 ~ 2022. 07 |
Work Scope | Design / Construction - Civil engineering, steel structure, machinery, electrical equipment, insulation, painting |
Clients / Projects | Green Chemical / A2 PJT - Construction of Anjinsan Repository and AM Plant 2 |
---|---|
Project Details | E / P / M / C |
Contract Period | 2022. 03 ~ 2023. 06 |
Work Scope | Design, manufacturing, purchasing, construction - civil engineering, steel structure, machinery, piping, electrical equipment, insulation, painting |
Clients / Projects | SK Gas / Ulsan Base - Civil engineering reinforcement of Bongdae Mountain Patrol Road area |
---|---|
Project Details | C |
Contract Period | 2022. 05 ~ 2023. 06 |
Work Scope | Civil engineering reinforcement work for slope |